Sorry! JavaScript is disabled in your browser. To get the best user experience on our website you should enable it.

Server Room & Datacentre (Data center) construction Turkey Solution provider.

2019-11-14

ID: #216085

Business Description

We offer Turkey solution for Server room & Data center complete site Preparation. In nutshell we offer Power, cooling and Monitoring solution for Tier I to Tier IV Datacenter and server rooms. We specialize in planning, designing, engineering, constructing Datacentre or Server room or Computer rooms with modern technologies. We do sizing & selection of various equipment like datacenter equipment such as UPS, Precision Air conditioner, Fire suppression, raised flooring, water leak detection system, environmental monitoring system, Static Transfer switch etc. As part of Datacenter and server room preparation, we do supply installation and commissioning of following equipment: 1) Uninterruptible Power Supply (UPS): We offer Three phase or single phase, redundant or standalone UPS with required battery backup time ranging from 1kvA to 4800kVA. 2) Close Control Unit (CCU) or Computer Room Air Conditioner (CRAC) or Precision Air Conditioner: We do sizing, supply, installation & commissioning of CRAC unit from 1kw to 180kw down/up flow type, chilled water or DX type. 3) Fire Suppression: We offer clean fire suppression system such as HFC-227e agent which is recommended for Server room and datacenter. Specialty of HFC-227e agent is it is very quick and do not leave any residue. It also called as FM200. 4) Raised Flooring: We offer different type of raised flooring or access flooring along with perforated tile for server room. 5) Water Leak Detection System. 6) Environmental monitoring system for server room which can monitor temperature & humidity in server room and can notify user through email, SMS or alarms. 7) Static Transfer Switch (STS): We offer Single & Three phase static transfer switch of 2 pole or 3 pole or 4 pole type. 8) Power Backup, conditioning and security equipments such as Generator, ATS, Transient voltage surge suppressor (TVSS), access control etc. We are one stop solution provider for building of Datacenter & Server room who can convert your rooms in modern Datacenter. Server room, data center, datacenter, server room preparation, server room construction, datacenter construction, datacenter preparation, data center construction, data center preparation, datacenter design, data center design, server room design, datacenter equipment, server room design, datacenter design, server room designing, datacenter designing, server room layout, serverroom, how to built server room, datacenter services, what is data center, what is data center, it datacenter -------------------------------------------------------------------------------------------------- CONTROL TECHNOLOGIES FZE (Ctrltech) Sharjah, UAE. T: +971 6 5489626 Mobile: +971 55 2338912 / +971 50 1537113 F: +971 6 5489627 E: [email protected] W: www.ctrltechnologies.com www.datacenter-serverroom.com Uninterruptible Power Supply | Close Control Unit | Precision Air Conditioner | Computer Room Air Conditioner | Dehumidifier | Voltage Stabilizer | Voltage Regulator | Water leak Detection | Environmental Monitoring | Static Transfer Switch | De-humidifier | Industrial Dehumidifier | Swimming Pool Dehumidifier | Air Cooler | Evaporative Air Cooler | Battery | Nickel Cadmium Battery | Aerial | Liebert | Airedale | Emicon | APC UPS | GE UPS | Ebac | Fral | Server Room | Datacenter | Datacenter Cooling |Server room Cooling | server room preparation | datacenter preparation | computer room preparation

Frequently Asked Questions

Where is Server Room & Datacentre (Data center) construction Turkey Solution provider. located?
Server Room & Datacentre (Data center) construction Turkey Solution provider. is located at lithihad road.
How can customers contact Server Room & Datacentre (Data center) construction Turkey Solution provider.?
Customers can contact Server Room & Datacentre (Data center) construction Turkey Solution provider. by phone at 0552338912.
Does Server Room & Datacentre (Data center) construction Turkey Solution provider. have an official website?
Yes, the official website of Server Room & Datacentre (Data center) construction Turkey Solution provider. is www.ctrltechnologies.com.

This listing has not yet been reviewed. Be the first to share your feedback!